Project Description

Gateway Flyover Construction

Location: I-35/I-435 Interchange; Overland Park, KS
Owner: Kansas DOT

Work Description:

  • Falsework Tower Design for construction of new bridge
  • Staged Erection Analysis of new bridge construction, including wind load analysis
  • Buckling Analysis for single girder stages
  • Girder Analysis for Deck Removal and Equipment Loading
  • Staged Demolition Analysis of existing bridge; including wind load analysis
  • Analysis of I-435 bridge below for support of cranes during demolition
  • Girder Hoisting Adequacy Evaluation