Project Description

Herrington Lake Bridge Replacement

Location: Harrodsburg, KY
Owner: Kentucky Transportation Cabinet

Work Description:

  • Engineered a floating platform and lowering system used for construction of the center pier located in a 200-ft deep section of the lake
  • Staged erection analysis of new bridge construction
  • Single girder and system buckling analysis performed for critical stages of steel girder erection
  • Falsework tower design for construction of new girders
  • Stability of barges during truss span removal